Connections:

  • The Head is attached to the Gantry via the Head Grabber Arm, which moves vertically on the Gantry via the Gantry Vertical Belt.

  • The Head Grabber Arm contains the Air Connections between the Head and the Gantry as well as the Head Power Plug.

  • The Air Lines are attached by matching colors.

    • Red Air Line controls the Blade Plunge.

    • Blue Air Line controls the Head Lift.

  • On newer models, the Head Assembly Power Cable Strain Relief spanner fits around the Head Power Plug.

  • On the Z1, the M12 Cable is attached between the Head Grabber Arm and the top of the Head.

HeadGrabberArmZ1On800.pngZ1GrabberArmHeadAttached800.png
note

Controlled by:

Controlled by:

Troubleshooting:

  • Q: The matboard is being pushed aside when you try to cut.

    • Make sure that your Air Compressor is on.

Related Links