Head Replacement: CMC 8000 Series, 9000 and Z(9000z)
Head | |
Caution:
| Pick up the Head by Holding the “D-Shaped” Upper and Lower Head Plates |
Head Removal | |
| Turn off the ECU |
| Click Reset Motors Button |
| Push Blade Cartridge Release Down to Eject the Blade Cartridge |
| Remove the Gantry Cover |
| Move Head and Gantry to the Right Side of the Board |
| Remove the Two Screws |
| Remove the Head Assembly Power Cable Strain Relief from the Grabber Arm
|
| Disconnect the Head Power Plug |
| Disconnect the Air Lines by Untwisting the Air Fittings |
| Roll the Head Down the Gantry |
Head Installation | |
| Roll Head onto Gantry |
| Slide Head onto Gantry |
| Line Up the Head to the Head Grabber Arm on the Right Side of Gantry |
| Twist Together the Matching Air Line Colors |
| Plug in the Head Power Plug |
| Locate the Head Assembly Power Cable Strain Relief and Screws |
| Slide the Head Assembly Power Cable Strain Relief Around the Head Power Plug Connection |
| Put the Screws Into the Head Assembly Power Cable Strain Relief, the Head Grabber Arm and into the Head |
| Replace the Gantry Cover |
IMPORTANT: PROCEED TO Head WHEEL ADJUSTMENT INSTRUCTIONS BELOW. | Lift the Head Up so That the Footblock Does not Strike the Side of the Board and Move the Gantry to the Left |
Head Wheel Adjustment | |
WARNING: To avoid damage to the Head, do not loosen the Head Wheel screws without first aligning the Head to the middle of the Board.
| Click the Power Button Align the Head |
| Loosen Each Head Wheel Adjustment Allen Screw Only Until the Wheels are Loose |
| Gently Rock the Head to Line up the Head Wheels to the Gantry Grooves |
| Retighten the Head Wheel Adjustment Allen Screws Consecutively |
| Check Head Wheels |
| Gently Rock the Head to Line up the Head Wheels to the Gantry Grooves |
| Click the Reset Motors Button |
| Realign the Head |
| Install the Blade Cartridge |
Test Cut: Adjust Horizontal Home | |
| Do a Test Cut |