Change Start: Order Cuts Trace

Change Start

Change Start

  • There are a number of reasons to change the Cut Start.

    • If you are having difficulties cutting a complex design and the blades are breaking or it is skipping steps, it may help to start the cut in a different place, such as in a corner rather than in the middle of two arcs. 

    • You may also want to do this if you are having problems with Fallouts sliding behind the mat you are cutting. Changing Cut Order and Changing Start Cut Points may resolve some of these issues.

ChangeStart70800.png
Change the Start of a Cut

Display Start Points

Display Start Points

  • The initial Blade Plunge and Cut Direction will be displayed as a triangle arrow.

Select to Show the Cut Start Points of the Objects

Select the Type of Object

Select the Type of Object

  • Select the desired Bevel/Cartridge Type you wish to change the initial plunge for from the Bevel/Cartridge Type Selection section by clicking the radio button next to it. 

  • Only the objects matching the Bevel/Cartridge Type selection will be displayed. 

  • The other Bevel/Cartridge Types of the design on the screen will be grayed out.

Select the Bevel Type and Cartridge Type

Changing the Start

Changing the Start

  • Select the object you want to edit by clicking on it.

Select the Desired Object
  • Click the Change Start button.

    • This will allow you to change the initial plunge for the object.

Click Change Start
  • Move the Blue Triangle cursor to where you want the initial blade plunge to start when it cuts this object.

Move Start Triangle to the Desired Position
  • Click to place the new start point of the initial Blade Plunge.

  • The Start Point of this object has now been changed.

Click to Set the Start Position
  • Do the same with the other openings.

  • In this example, the openings will begin cutting at the bottom left corner instead of at the top left corner. 

Do the Same with Other Objects as Desired