/
Maintenance Schedule for the AirGlide

Maintenance Schedule for the AirGlide

Maintenance Section

Maintenance Section

WizardTM AirGlide Parts Labelled

Maintaining the Machine

  • The AirGlide is pressurized. Disconnect AirGlide from air source prior to servicing.

  • Frequently apply a drop of light alcohol based oil to the glass cutting wheel.

  • Keep the horizontal rail assembly surface clean of debris.

  • Brush away all glass and substrate accumulation with a light brush.

  • Check trolley wheel tension and wear monthly.

  • Adjust or replace wheel assemblies when needed. (See Maintenance section of Operation’s Manual)

  • Check AirGlide for parallel and perpendicularity between gantry and frame monthly.

  • Adjust when needed (See the Operation’s section of Operation’s Manual).

  • Check trolley cable tension. Cable tension should be 10 lbs. at 1” (25mm). (See Maintenance section of Operation’s Manual)

  • Drain the water separator on the air regulator weekly.

  • DO NOT use the clamp when scoring or breaking glass.

Related content

Troubleshooting the AirGlide
Troubleshooting the AirGlide
More like this
AirGlide Control Panel Levers
AirGlide Control Panel Levers
More like this
Maintenance Recommended for the CMC: All Current CMC Models
Maintenance Recommended for the CMC: All Current CMC Models
More like this
Air Valve Assembly
Air Valve Assembly
More like this
Wizard AirGlide Installation Instructions
Wizard AirGlide Installation Instructions
More like this
Maintenance for the Eclipse Pro Legacy
Maintenance for the Eclipse Pro Legacy
More like this