Head Installation |
---|
| |
| |
NOTE: If you are installing the head and having difficulty getting the head wheels onto the gantry, see the Head Wheel Adjustment further down in this document. | |
| |
| |
| |
| |
Holding the head in position so that the head lines up neatly to the Head Assembly Power Cable Strain Relief on the head grabber arm, screw in the two 5/8” 32” screws, making sure they go into the Head Assembly Power Cable Strain Relief and the head grabber arm and then into the head. Tighten firmly
| |
If removed, replace the Head Stop Plate to the bottom of the gantry under the belt tensioner after the head is slid onto the gantry. Note that the notched side is placed toward the gantry.
| |
| |
| |
| |
| |
| |
IMPORTANT: PROCEED TO THE HEAD WHEEL ADJUSTMENT INSTRUCTIONS BELOW. | |